Go to content Go to navigation Go to search

January 5 Trip To Cotubic

The Men’s Group continued its run of spending the first Saturday of every month working at Camp Cotubic. Seven guys made the trip, leaving at around 7AM and returning around 6 PM. Work continued on the staff house that has been the focus for our church this year.

This time we continued to work on the two bathrooms. We had to remove once again remove the shower/tub unit to fix the plumbing in one bathroom. That involved lifting the unit up to the ceiling and supporting it there while we did the work. It was too big to get out the door so that was the only option available. It took awhile to get the plumbing done and get everything back in place. Then we were able to finish putting in the sub-floor and repairing one of the walls.

The other bathroom is farther along and we were able to do a lot more in there. We got the sub-floor in as well as all of the paneling for the walls. In addition, we got the new light fixture in and got the lavatory partially assembled. Next up will be painting the ceiling, putting in the linoleum, and installing the finish trim. Then we will be ready to put in the final fixtures for that bathroom.

It was nice to leave the camp looking better than we found it this time. The last few trips involved demolition so it always ended up looking worse. We plan on heading back on February 2nd. If you would like to join us please let Rob or Kevin know.

© 2006-2008 Zanesville United Brethren Church